Highlights include 69m at 3.8g/t PGM+Au including 5m at 25.4g/t PGM+Au, 45m at 5.0g/t PGM+Au, and 24.9m at 5.9g/t PGM+Au, 0.12% Ni

VANCOUVER, BC, July 29, 2024 /CNW/ - Bravo Mining Corp. (TSXV: BRVO) (OTCQX: BRVMF), ("Bravo" or the "Company") has received assay results from fifteen diamond drill holes ("DDH") from the North Sector at its 100% owned Luanga palladium + platinum + rhodium + gold + nickel deposit ("Luanga deposit" or "Luanga PGM+Au+Ni deposit"), located in the Carajás Mineral Province, state of Pará, Brazil.

"The numerous thick high-grade drill intercepts from the North Sector of the Luanga deposit has significantly enhanced the resource potential in this area, thus establishing a second centre of gravity for the Luanga deposit," said Luis Azevedo, Chairman and CEO. "In the Luanga deposit mineral resource estimate ("MRE". See press release October 22, 2023), the Central Sector was seen to host a large proportion of the mineral resources, largely due to the concentration of historical holes and Bravo drilling. In contrast, the North Sector had only seen limited drilling at the time of the MRE. However, Bravo's recent drilling, has consistently intercepted thicker zones of higher-grade mineralization within 150m of surface, as illustrated by the sections in this press release."

Highlights Include:

  • Drilling in the North Sector continues to show improvements in both grade and thickness compared to historic drilling in this sector.
  • Mineralization intersected to date (see Sections 1 and 2) lies within 150m of surface and is open to further extension at depth.
  • The North Sector at the Luanga deposit is now recognised as a second centre of gravity of multiple thick high grade mineralized zones.
  • The current round of BHEM (bore-hole electromagnetic) surveying is close to completion. Drilling has recommencing at T5, testing new conductors along strike defined by this work. This will be followed by drilling at new and re-evaluated HeliTEM targets.

HOLE-ID

From

To

Thickness

(m)

Pd

Pt

Rh

Au

PGM + Au

Ni* (%)

Sulphide

TYPE

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

DDH24LU245

3.00

72.40

69.40

1.63

1.82

0.23

0.08

3.77

NA

FR/LS

including

9.20

14.20

5.00

8.81

14.99

1.62

0.01

25.42

NA

FR/LS

Also including

44.05

72.40

28.35

1.76

0.94

0.14

0.18

3.01

0.25

FR

And

115.00

143.00

28.00

1.58

1.28

0.19

0.04

3.10

0.02

FR

DDH24LU247

0.00

31.00

31.00

1.05

0.81

0.22

0.01

2.10

NA

Ox

DDH24LU248

45.40

70.30

24.90

2.31

3.27

0.27

0.03

5.88

0.12

FR/LS

including

45.40

55.40

10.00

4.48

7.36

0.58

0.04

12.46

0.08

FR/LS

DDH24LU249

111.40

157.40

46.00

1.41

0.69

0.14

0.06

2.30

0.18

FR

DDH24LU250

111.50

117.50

6.00

4.18

2.92

0.49

0.32

7.91

0.11

FR

And

124.50

131.50

7.00

2.25

1.85

0.34

0.08

4.52

0.08

FR

And

66.80

67.80

1.00

156.45

158.25

>10.0

2.16

326.85

0.06

FR

DDH24LU252

0.00

152.30

152.30

0.40

0.75

0.04

<0.01

1.20

NA

Ox/FR

DDH24LU254

84.50

92.50

8.00

2.76

1.28

0.24

0.19

4.47

0.15

FR

And

21.35

64.70

43.35

1.52

0.80

0.13

0.22

2.67

0.20

FR

DDH24LU258

0.00

45.60

45.60

2.48

1.85

0.34

0.34

5.01

NA

Ox

DDH24LU259

8.60

10.60

2.00

12.76

42.15

4.79

2.59

62.28

NA

Ox

Notes:  All 'From', 'To' depths, and 'Thicknesses' are downhole. 'NA' Not applicable for Oxide material.
Given orientation of drilling and mineralization, intercepts are estimated at 125% to 140% of true thickness in the North Sector.
Type: Ox = Oxide. FR = Fresh Rock. LS = Low Sulphide. Recovery methods and results will differ based on the type of mineralization.
*Bravo's nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historical total nickel assays.

Luanga Drilling Update

Results from fifteen diamond drill holes have been received from the North Sector of the Luanga PGM+Au+Ni deposit. All the drill holes reported herein are angled holes (-60 degrees), towards an azimuth of 090°. Together, this set of drill holes comprise a total of 3,212.45 metres of diamond drilling.

Section 1 (Figure 1) in the North Sector shows infill and step-out drilling, with DDH24LU249 being the deepest drill hole on the section, exhibiting a wide zone of mineralization, open at depth, within 150m from surface, and consistently increasing in grade from DDH22LU090 to DDH24LU247 to DDH22LU086 to DDH24LU249. Trenching (TR23LU024) in this area also demonstrates the significant volume of near surface oxide mineralization. These results continue to bode well for potential future MRE updates. In comparison, the Central Sector has been defined to depths of up to 400m below surface, more than twice the depth of current drilling in the North Sector. The addition of a second centre of gravity for the Luanga PGM+Au+Ni deposit has potential to enhance future project economics, as and when demonstrated, mineralization could potentially be extracted from shallower depths for longer periods.

Figure 1: North Sector (Section 1 on Figure 3). High-grade and thick mineralization near surface and continuing at depth. (CNW Group/Bravo Mining Corp.)

Section 2 (Figure 2) is an infill section in the North Sector. Drilling also shows evidence of increasing thickness at depth, again with mineralization defined to date less than 150m from surface and still open at depth. As with Section 1 and in comparison, to the Central Sector, there is still significant potential to extend mineralization to depth while remaining potentially amenable to open pit exploitation, subject to future economic studies. Furthermore, Section 2 shows high volumes of mineralization in comparison to the volume of unmineralized material, demonstrating the potential for relatively low strip ratios in these areas.

Figure 2: North Sector (Section 2 on Figure 3). Wide zones of mineralization with low proportions of unmineralized material. (CNW Group/Bravo Mining Corp.)

HeliTEM (Helicopter borne EM) and Copper/Gold Exploration Update

Exploration is progressing on both BHEM targets and HeliTEM targets. The current round of BHEM surveying is close to completion. Drilling has recommencing at T5, testing new conductors defined along strike by this work. BHEM is currently in progress at T11. Following the new holes planned at T5, drilling will move to T11, followed by initial testing of new and re-evaluated HeliTEM targets.

Drill Results Status Update

A total of 311 drill holes have been completed by Bravo to date, for 66,366 metres, including 8 metallurgical holes (not subject to routine assaying). Results have been reported for 267 Bravo drill holes to date. Assay results for 36 Bravo drill holes that have been completed are currently outstanding (excluding the metallurgical holes).

Complete Table of Recent Intercepts.

HOLE-ID

From

To

Thickness

(m)

Pd

Pt

Rh

Au

PGM + Au

Ni* (%)

Sulphide

Cu (%)

Sulphide

TYPE

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

(g/t)

DDH24LU243

162.45

169.45

7.00

0.22

0.73

0.04

<0.01

0.99

0.01


FR

DDH24LU245

3.00

72.40

69.40

1.63

1.82

0.23

0.08

3.77

NA


FR/LS

including

9.20

14.20

5.00

8.81

14.99

1.62

0.01

25.42

NA


FR/LS

Also including

44.05

72.40

28.35

1.76

0.94

0.14

0.18

3.01

0.25


FR

And

79.70

89.40

9.70

0.65

0.55

0.09

0.12

1.41

0.09


FR

And

115.00

143.00

28.00

1.58

1.28

0.19

0.04

3.10

0.02


FR

And

150.00

154.00

4.00

0.46

0.19

0.04

0.01

0.70

0.05


FR

And

182.00

190.00

8.00

0.34

0.11

0.02

0.02

0.49

0.07


FR

And

197.00

201.05

4.05

0.40

0.10

0.02

<0.01

0.52

0.05


FR

DDH24LU247

0.00

31.00

31.00

1.05

0.81

0.22

0.01

2.10

NA


Ox

And

51.65

93.50

41.85

0.84

0.41

0.09

0.01

1.35

0.11


FR

including

60.65

76.50

15.85

1.15

0.55

0.12

0.01

1.84

0.13


FR

And

102.50

115.50

13.00

0.27

0.25

0.04

<0.01

0.57

0.03


FR

And

119.50

123.50

4.00

0.77

0.34

0.05

0.01

1.16

0.05


FR

And

151.50

153.50

2.00

5.06

2.49

0.21

0.01

7.77

0.10


FR

And

162.50

171.50

9.00

0.36

0.13

0.01

0.01

0.50

0.06


FR

DDH24LU248

0.00

3.91

3.91

0.79

0.44

0.08

0.01

1.32

NA


Ox

And

45.40

70.30

24.90

2.31

3.27

0.27

0.03

5.88

0.12


FR/LS

including

45.40

55.40

10.00

4.48

7.36

0.58

0.04

12.46

0.08


FR/LS

And

75.90

79.90

4.00

0.86

0.41

0.06

0.02

1.35

0.26


FR

And

96.15

100.30

4.15

0.57

0.31

0.03

0.02

0.93

0.14


FR

DDH24LU249

0.00

6.80

6.80

0.30

0.32

0.06

0.01

0.69

NA


Ox

And

18.00

26.00

8.00

0.27

0.77

0.22

<0.01

1.27

NA


FR/LS

And

33.90

46.35

12.45

0.51

0.77

0.04

0.01

1.33

0.01


FR

And

54.35

60.35

6.00

0.51

0.30

0.06

0.01

0.88

0.06


FR

And

181.10

187.10

6.00

0.25

0.51

0.07

<0.01

0.83

0.01


FR

And

94.10

102.00

7.90

0.36

0.82

0.11

0.02

1.30

0.02


FR

And

111.40

157.40

46.00

1.41

0.69

0.14

0.06

2.30

0.18


FR

And

173.90

182.90

9.00

0.79

0.41

0.09

0.09

1.37

0.14


FR

And

241.00

244.00

3.00

<0.01

<0.01

0.01

0.02

0.03

0.01

0.68

FR

DDH24LU250

111.50

117.50

6.00

4.18

2.92

0.49

0.32

7.91

0.11


FR

And

124.50

131.50

7.00

2.25

1.85

0.34

0.08

4.52

0.08


FR

DDH24LU251

0.00

3.30

3.30

0.36

0.30

0.07

0.01

0.74

NA


Ox

And

66.80

67.80

1.00

156.45

158.25

>10.0

2.16

326.85

0.06


FR

DDH24LU252

0.00

152.30

152.30

0.40

0.75

0.04

<0.01

1.20

NA


Ox/FR

including

0.00

27.45

27.45

0.56

1.41

0.03

0.01

2.00

NA


Ox

And

192.50

197.50

5.00

0.84

0.28

0.04

0.13

1.29

0.13


FR

DDH24LU253

0.00

28.50

28.50

0.36

0.70

0.03

0.01

1.09

NA


Ox

And

120.30

123.30

3.00

0.61

0.28

0.02

<0.01

0.92

0.03


FR

DDH24LU254

0.00

27.30

27.30

0.38

0.12

0.01

0.08

0.58

NA


Ox

And

41.30

80.90

39.60

0.75

0.37

0.06

0.12

1.31

0.19


FR

And

84.50

92.50

8.00

2.76

1.28

0.24

0.19

4.47

0.15


FR

And

93.50

101.50

8.00

0.39

0.21

0.02

0.05

0.67

0.13


FR

And

193.00

196.00

3.00

0.39

1.06

0.39

0.01

1.85

0.05


FR

And

208.00

216.00

8.00

0.55

0.36

0.07

0.01

1.00

0.01


FR

And

227.00

231.00

4.00

0.18

0.06

0.02

0.05

0.31

0.07

0.72

FR

DDH24LU255

0.00

1.84

1.84

1.30

1.28

0.23

0.04

2.85

NA


Ox

And

60.60

63.60

3.00

0.71

0.45

0.06

0.01

1.23

0.02


FR

And

77.60

90.60

13.00

1.08

0.97

0.19

0.01

2.26

0.02


FR

And

152.30

164.30

12.00

0.42

0.21

0.03

0.02

0.68

0.08


FR

And

185.05

185.85

0.80

0.41

0.14

0.05

<0.01

0.60

2.11


FR

DDH24LU256

0.00

8.35

8.35

1.39

0.55

0.10

0.10

2.14

NA


Ox

And

21.35

64.70

43.35

1.52

0.80

0.13

0.22

2.67

0.20


FR

And

71.70

72.70

1.00

8.56

8.86

1.50

0.53

19.40

0.01


FR

And

85.60

89.60

4.00

0.72

0.35

0.04

0.03

1.14

0.06


FR

And

131.60

166.60

35.00

0.61

0.35

0.06

0.05

1.07

0.10


FR

DDH24LU257

0.00

18.80

18.80

0.35

0.62

0.09

0.01

1.07

NA


Ox

DDH24LU258

0.00

45.60

45.60

2.48

1.85

0.34

0.34

5.01

NA


Ox

And

88.60

90.60

2.00

2.18

9.91

2.19

0.15

14.43

0.01


FR/LS

And

99.60

104.60

5.00

0.26

0.28

0.08

0.01

0.62

0.01


FR

And

162.60

180.60

18.00

0.30

0.18

0.03

0.03

0.53

0.03


FR

DDH24LU259

8.60

10.60

2.00

12.76

42.15

4.79

2.59

62.28

NA


Ox

And

13.60

73.90

60.30

0.31

0.54

0.05

<0.01

0.91

0.01


Ox/FR

And

77.90

78.90

1.00

0.66

13.98

3.03

<0.01

17.67

0.01


FR/LS

And

134.45

172.70

38.25

0.41

0.40

0.06

0.01

0.88

0.05


FR

Notes:  All 'From', 'To' depths, and 'Thicknesses' are downhole. 'NA' Not applicable for Oxide material.

Given orientation of drilling and mineralization, intercepts are estimated at 125% to 140% of true thickness in the North Sector.

Type: Ox = Oxide. FR = Fresh Rock. LS = Low Sulphide. Recovery methods and results will differ based on the type of mineralization.

* Bravo's nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historical total nickel assays

Figure 3: Location of Bravo Drilling and Sections Reported in this News Release (CNW Group/Bravo Mining Corp.)

About Bravo Mining Corp.

Bravo is a Canadian and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM+Au+Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project is situated on mature freehold farming land and benefits from being in a location close to operating mines and a mining-experienced workforce, with excellent access and proximity to existing infrastructure, including road, rail, and clean renewable hydro grid power. A fully funded 63,000m infill, step out and exploration drilling and trenching program is well advanced for 2024. Bravo's current Environmental, Social and Governance activities includes planting more than 30,000 high-value trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company's "qualified person" as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). Mr. Mottram has verified the technical data and opinions contained in this news release.

For further information about Bravo, please visit www.bravomining.com

Forward Looking Statements 

This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information is characterized by words such as "thick", "high-grade", "centre of gravity", "numerous", "significantly", "enhanced", "potential", "concentration", "consistently", "improvement", "extension", "centre of gravity", "numerous", "bodes well", variants of these words and other similar words, phrases, or statements that certain events or conditions "may" or "will" occur. This news release contains forward-looking information pertaining to the Company's ongoing drill program and the results thereof; comparisons to historical and/or prior Bravo drilling; the potential for extensions to mineralization at depth; the potential for greater thicknesses and/or higher grades at depth; the impact of current and future drilling on future mineral resource estimates, after taking into account other modifying factors; whether or not the mineralization is amenable to open pit mining and, if so, to what extent; the potential for a second centre of gravity for the Luanga deposit; potential economic outcomes, including strip ratios, in future economic studies; and the Company's plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, unexpected results from exploration programs, changes in the state of equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward-looking information in this news release is based on the opinions and assumptions of management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm that the interpreted mineralization contains significant values of nickel, PGMs and Au; that the mineralization remains open to depth, that PGM and/or Ni grades and mineralized thicknesses are improving to depth; that final drill and assay results will be in line with management's expectations; that activities will not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project will not be materially affected by potential supply chain disruptions; and general business and economic conditions will not change in a materially adverse manner. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

Schedule 1: Drill Hole Collar Details

HOLE-ID

Company

East (m)

North (m)

RL (m)

Datum

Depth

(m)

Azimuth

Dip

Sector

DDH24LU243

Bravo

659320.296

9343423.067

234.075

SIRGAS2000_UTM_22S

180.35

90.00

-60.00

North

DDH24LU245

Bravo

659449.908

9343222.998

265.789

SIRGAS2000_UTM_22S

201.05

90.00

-60.00

North

DDH24LU247

Bravo

659487.730

9343274.466

255.947

SIRGAS2000_UTM_22S

195.85

90.00

-60.00

North

DDH24LU248

Bravo

659629.167

9342814.033

287.632

SIRGAS2000_UTM_22S

115.25

90.00

-60.00

North

DDH24LU249

Bravo

659418.889

9343274.468

256.112

SIRGAS2000_UTM_22S

260.65

90.00

-65.00

North

DDH24LU250

Bravo

659586.252

9342814.013

279.501

SIRGAS2000_UTM_22S

150.80

90.00

-60.00

North

DDH24LU251

Bravo

659558.654

9342926.032

280.623

SIRGAS2000_UTM_22S

136.25

90.00

-60.00

North

DDH24LU252

Bravo

659397.252

9343223.012

257.381

SIRGAS2000_UTM_22S

260.75

90.00

-60.00

North

DDH24LU253

Bravo

659511.538

9342926.040

274.883

SIRGAS2000_UTM_22S

195.70

90.00

-60.00

North

DDH24LU254

Bravo

659498.123

9343222.968

273.546

SIRGAS2000_UTM_22S

275.25

90.00

-60.00

North

DDH24LU255

Bravo

659511.241

9343022.997

273.370

SIRGAS2000_UTM_22S

260.15

90.00

-60.00

North

DDH24LU256

Bravo

659492.743

9343174.490

275.190

SIRGAS2000_UTM_22S

280.80

90.00

-60.00

North

DDH24LU257

Bravo

659462.439

9343074.444

260.638

SIRGAS2000_UTM_22S

160.25

90.00

-60.00

North

DDH24LU258

Bravo

659498.366

9343123.980

266.226

SIRGAS2000_UTM_22S

278.55

90.00

-60.00

North

DDH24LU259

Bravo

659399.385

9343174.526

254.921

SIRGAS2000_UTM_22S

260.80

90.00

-60.00

North

Schedule 2: Assay Methodologies and QAQC

Samples follow a chain of custody between collection, processing, and delivery to the SGS Geosol laboratory in Parauapebas, state of Pará, Brazil. The drill core is delivered to the core shack at Bravo's Luanga site facilities and processed by geologists who insert certified reference materials, blanks, and duplicates into the sampling sequence. Drill core is half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas SGS Geosol laboratory by Bravo staff. Additional information about the methodology can be found on the SGS Geosol website (SGS) in their analytical guides. Information regarding preparation and analysis of historic drill core is also presented in the table below, where the information is known.

Quality Assurance and Quality Control ("QAQC") is maintained internally at the lab through rigorous use of internal certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo SGS Geosol

Preparation

Method

Method

Method

Method

For All Elements

Pt, Pd, Au

Rh

Sulphide Ni, Cu

Trace Elements

PRPCLI (85% at 200#)

FAI515

FAI30V

AA04B

ICP40B

SOURCE Bravo Mining Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2024/29/c8426.html