SUDBURY, ON, Feb. 8, 2023 /CNW/ - Frontier Lithium Inc. (TSXV: FL) (FRA: HL2) (OTCQX: LITOF) ("Frontier" or "the Company") is pleased to announce the results for the remaining seven drill holes completed during Phase XII drill program on the Spark pegmatite which began in May with two diamond drill rigs and finished in October of 2022.The main objective of the program was focused on converting inferred material to the indicated category for the planned open pit.  The Spark pegmatite is one of the two delineated premium spodumene-bearing lithium deposits on the PAK Lithium Project.

Highlights
  • The Company completed 15,984m of drilling in 50 holes in 2022. Highlights from the seven Phase XII diamond drill holes reported are included below.
  • DDH PL-094-22 was designed to define the western extent of the Spark pegmatite and to target the recently discovered NW Spark zone. This hole was the first indication that the NW zone was connected to the main Spark pegmatite at depth, intersecting 125.9m of pegmatite averaging 1.51% Li2O.
    • Including 12.0m from 181.5 to 193.5m averaging 2.08% Li2O
    • Including 9.8m from 228.7 to 238.5m averaging 2.94% Li2O
    • Including 8.0m from 246.5 to 254.5m averaging 2.95% Li2O
    • Including 8.0m from 270.5 to 278.5m averaging 2.32% Li2O
  • DDH PL-098-22 hole was designed to follow up on the results from PL-094-22 and confirmed that the NW zone is in fact connected to the main Spark ore body at depth, intersecting 398.25m of pegmatite averaging 1.88% Li2O.
    • Including 18.0m from 20.5 to 38.5m averaging 2.48% Li2O
    • Including 23.4m from 244.0 to 267.4m averaging 3.12% Li2O
    • Including 16.0m from 282.0 to 298.0m averaging 2.70% Li2O
    • Including 38.0m from 390.0 to 428.0m averaging 2.65% Li2O
  • DDH PL-099-22 hole was designed to follow up on the results from PL-098-22, intersecting 243m of pegmatite averaging 1.58% Li2O, extending the NW zone further to the west.
    • Including 9.0m from 122.3 to 131.3m averaging 2.47% Li2O
    • Including 7.5m from 256.7 to 264.2m averaging 3.02% Li2O
    • Including 31.5m from 338.0 to 369.5m averaging 2.03% Li2O
    • Including 6.0m from 430.0 to 436m averaging 3.25% Li2O

"Now that all the results have been received and processed, we can say that our goal of upgrading Inferred has been achieved and the Spark pegmatite continues to increase in size particularly with the intersections in holes PL-098-22 and PL-099-22. These two holes, which are 140m apart, have confirmed that the new northwest zone discovered in February 2022 is connected to the main zone and contains significant high-grade zones of 2 to 3% Li2O." states Garth Drever, VP Exploration. "This zone will certainly be explored during the 2023 drill program at Spark."

The initial objective for the Phase XII drill program was focused on converting the inferred resource within the Spark deposit to the indicated category in preparation for a pre-feasibility study (PFS) on the PAK Lithium Project.  The latter half of the program included geotechnical drilling for ground control and pit design purposes as well as step out drilling to define the eastern and western extents of the ore body.

Figure 1 is a location map showing the project area including Frontier's land tenure and location of the three lithium-cesium-tantalum pegmatites. 

Figure 1: Location Map showing land tenure and geology (CNW Group/Frontier Lithium Inc.)

Figure 2 is a plan view showing all drilling with analytical data completed with emphasis on drill hole traces reported in this release.

Figure 2: Planview map of the Spark pegmatite showing drillhole traces (CNW Group/Frontier Lithium Inc.)

Table 1 details the drill holes and channel with mineralized intersections while Table 2 summarizes all Phase XII drill holes completed.

Table 1: Details of Mineralized Intersections

DDH PL-092-22

Collared in the same location as PL-089-22, the hole was drilled in the opposite direction to the south, designed to define the eastern end of the main Spark pegmatite at depth before it begins to break up into smaller pods towards the east.  A total of 198m of pegmatite was intersected.

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

0.0

35.8

35.8

1.43

0.03

156

127

54

0.24

Pegmatite-Aplite


including

9.8

22.0

12.2

2.08

0.02

67

65

46

0.24

Pegmatite

Li-Enriched

58.3

228.5

170.3

1.36

0.01

62

87

49

0.24

Aplite w/ minor mafics rafts


including

85.0

105.0

20.0

1.85

0.01

76

96

40

0.30

Aplite



including

127.0

133.0

6.0

2.01

0.01

68

91

40

0.26

Aplite















DDH PL-093-22

Collared 30m north of PL-055-22 and 60m west of PL-091-22, the hole was stepped out to define the western extent of the Spark pegmatite where it breaks up into smaller pods separated by mafic rafts.  A total of 79m of pegmatite was intersected.

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

59.0

81.4

22.4

1.84

0.01

41

70

36

0.29

Pegmatite-Aplite


including

73.0

79.0

6.0

2.87

0.01

33

54

23

0.21

Pegmatite

Li-Enriched

91.8

159.0

67.2

1.78

0.07

149

58

88

0.40

Pegmatite-Aplite w/minor mafic


including

113.5

121.5

8.0

3.27

0.02

245

86

48

0.27

Aplite



including

130.2

159.0

28.8

2.66

0.05

218

57

121

0.54

Pegmatite














DDH PL-094-22

Collared 8m west of PL-091-22, hole was designed to define the western extent of the Spark pegmatite where it begins to break up into smaller pods separated by mafic rafts and was also extended to target the recently discovered NW Spark zone.  This hole was the first indication that the NW zone (PL-056-22 discovery hole) was connected to the main Spark pegmatite at depth.  A total of 135m of pegmatite was intersected.

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

43.4

49.5

6.1

1.59

0.00

62

55

27

0.17

Pegmatite w/ minor  mafic rafts

Li-Enriched

56.2

60.5

4.3

2.46

0.01

46

49

55

0.19

Pegmatite w/ minor  mafic rafts

Li-Enriched

68.0

72.8

4.8

1.64

0.01

49

28

44

0.39

Pegmatite w/ minor  mafic rafts

Li-Enriched

145.6

159.0

13.5

1.89

0.08

83

19

43

0.18

Pegmatite w/ minor  mafic rafts


including

150.0

154.5

4.5

3.62

0.00

120

17

43

0.05

Pegmatite

Li-Enriched

177.4

303.3

125.9

1.51

0.04

86

52

66

0.33

Pegmatite-Aplite w/ minor mafic


including

181.5

193.5

12.0

2.08

0.05

126

64

73

0.58

Pegmatite-Aplite


including

228.7

238.5

9.8

2.94

0.02

65

32

38

0.22

Pegmatite-Aplite


including

246.5

254.5

8.0

2.95

0.05

73

33

26

0.59

Pegmatite-Aplite


including

270.5

278.5

8.0

2.32

0.01

64

78

56

0.21

Pegmatite-Aplite














DDH PL-095-22

Collared 10m SW of PL-068-22, hole was designed to further define a mafic raft that splits the Spark pegmatite on the east end of the main body.  A total of 127m of pegmatite was intersected.

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

0.0

49.1

49.1

1.67

0.02

83

90

51

0.25

Pegmatite-Aplite


including

6.0

14.0

8.0

2.17

0.02

85

66

27

0.22

Pegmatite-Aplite


including

20.0

30.0

10.0

2.08

0.03

75

78

73

0.24

Pegmatite-Aplite

Li-Enriched

79.0

89.5

10.5

1.94

0.01

116

70

46

0.27

Pegmatite-Aplite

Li-Enriched

131.6

155.0

23.4

1.41

0.01

67

67

47

0.19

Aplite with minor mafics

Li-Enriched

212.5

234.5

22.0

1.82

0.01

54

92

52

0.22

Aplite



including

212.5

218.5

6.0

2.17

0.01

54

91

38

0.20

Aplite















DDH PL-096-22

Collared 6m east of PL-043-19, hole was stepped out to the east to define the extent of the smaller pegmatite pods that break up, separated by mafic rafts.  Results show that there is still mineable pegmatite to the east as we move away from the main Spark ore body.  A total of 106m of pegmatite was intersected.

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

80.2

86.9

6.7

1.67

0.02

136

57

45

0.19

Pegmatite

Li-Enriched

102.0

108.4

6.4

1.57

0.02

140

89

138

0.36

Aplite


Li-Enriched

149.9

197.3

47.5

1.51

0.02

116

55

100

0.28

Pegmatite-Aplite w/ minor mafics


including

173.5

187.5

14.0

1.89

0.02

114

73

170

0.38

Aplite















DDH PL-098-22

Collared south of the Spark pegmatite in between PL-090-22 and PL-067-22, hole was designed to follow up on the results of PL-056-22 that initially indicated what appeared to be a new high grade NW zone.  PL-098-22 results have confirmed what was later suggested by PL-094-22, that the NW zone is in fact connected to the main Spark ore body at depth.  398.25m of pegmatite at 1.88% Li2O was intersected, including minor dilution from mafic rafts

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

14.4

304.8

290.4

1.87

0.03

92

77

53

0.28

Aplite-Pegmatite w/ minor mafics


including

20.5

38.5

18.0

2.48

0.01

55

72

24

0.20

Aplite-Pegmatite


including

56.5

72.5

16.0

2.43

0.02

71

73

52

0.29

Aplite-Pegmatite


including

78.5

90.5

12.0

2.08

0.01

88

82

53

0.28

Aplite-Pegmatite


including

118.5

128.5

10.0

2.22

0.01

68

89

28

0.22

Aplite-Pegmatite


including

144.5

186.5

42.0

2.00

0.03

123

88

54

0.28

Aplite-Pegmatite


including

244.0

267.4

23.4

3.12

0.03

64

32

40

0.32

Aplite-Pegmatite


including

282.0

298.0

16.0

2.70

0.02

153

87

62

0.31

Aplite-Pegmatite

Li-Enriched

342.2

450.1

107.9

1.92

0.07

192

69

223

0.48

Aplite-Pegmatite w/ minor mafics


including

344.0

350.0

6.0

2.52

0.06

234

67

249

0.42

Aplite-Pegmatite


including

370.0

376.0

6.0

2.41

0.08

309

59

143

0.53

Aplite-Pegmatite


including

390.0

428.0

38.0

2.65

0.08

123

53

139

0.53

Aplite-Pegmatite














DDH PL-099-22

Collared 85m NW of PL-056-22, hole was designed to follow up results from PL-056, PL-094, and PL-098 whereby the NW zone has been connected to the main ore body at depth.  243m of pegmatite at 1.58% Li2O was intersected and has extended the zone at depth further to the west.

Zone

From (m)

To (m)

Width (m)

Li2O  (%)

Cs2O (%)

Ta2O5 (ppm)

Nb2O5 (ppm)

SnO2 (ppm)

Rb2O (%)

Unit


Li-Enriched

106.6

150.3

43.7

1.54

0.07

126

34

98

0.58

Pegmatite w/ minor mafics


including

122.3

131.3

9.0

2.47

0.05

145

42

91

0.51

Pegmatite

Li-Enriched

167.5

211.0

43.5

1.23

0.07

198

56

317

0.30

Pegmatite-Aplite


including

193.5

202.2

8.7

2.16

0.03

83

34

259

0.35

Pegmatite

Li-Enriched

234.3

247.7

13.4

1.38

0.24

537

58

169

0.52

Pegmatite w/ minor mafics

Li-Enriched

256.7

264.2

7.5

3.02

0.03

312

52

111

0.38

Pegmatite

Li-Enriched

278.2

322.6

44.4

1.70

0.06

191

86

162

0.42

Pegmatite-Aplite


including

278.2

286.0

7.8

2.27

0.05

313

61

123

0.41

Pegmatite-aplite


including

294.0

309.0

15.0

2.13

0.06

110

67

149

0.31

Pegmatite-aplite

Li-Enriched

338.0

369.5

31.5

2.03

0.09

194

80

162

0.63

Pegmatite


including

358.0

364.0

6.0

2.68

0.06

267

101

176

0.40

Pegmatite

Li-Enriched

404.7

463.8

59.1

1.40

0.14

226

94

155

0.51

Pegmatite-aplite


including

407.0

413.0

6.0

2.26

0.07

161

72

99

0.90

Pegmatite-aplite


including

430.0

436.0

6.0

3.25

0.03

58

26

41

0.32

Pegmatite-aplite

 

 

Table 2:  Summary of Phase XII Drill Program (May to October 2022)

DDHNo

Date Drilled

UTM Zone 15N (NAD83)

Collar Orient

Metres Drilled

Start

End

Easting

Northing

(mASL)

Azim

Dip

Start

End

Phase XII

PL-057-221

2022-05-15

2022-10-01

472,733

5,829,489

355.9

359

-55

0

225

PL-058-221

2022-05-17

2022-10-03

472,733

5,829,489

355.9

177

-70

0

400

PL-059-222

2022-05-24

2022-05-28

472,698

5,829,535

356.0

165

-78

0

316

PL-060-222

2022-05-27

2022-06-04

472,749

5,829,559

360.0

180

-73

0

360

PL-061-222

2022-05-20

2022-05-27

472,773

5,829,561

360.2

178

-65

0

327

PL-062-223

2022-05-28

2022-06-05

472,712

5,829,596

356.2

176

-65

0

360

PL-063-221

2022-06-05

2022-06-10

472,746

5,829,539

360.0

187

-70

0

348.5

PL-064-221

2022-06-05

2022-06-10

472,712

5,829,596

356.2

141

-65

0

352.5

PL-065-224

2022-06-10

2022-06-22

472,686

5,829,583

354.0

173

-72

0

330.86

PL-066-223

2022-06-12

2022-06-27

472,732

5,829,371

325.0

323

-70

0

365.67

PL-067-224

2022-06-29

2022-07-04

472,778

5,829,383

327.0

315

-70

0

352.5

PL-068-222

2022-06-22

2022-06-27

472,790

5,829,540

360.0

171

-55

0

343.5

PL-069-224

2022-07-06

2022-07-15

472,814

5,829,385

326.0

324

-61

0

412.3

PL-070-223

2022-06-28

2022-07-04

472,805

5,829,588

360.0

184

-54

0

405

PL-071-223

2022-07-04

2022-07-15

472,805

5,829,588

360.0

160

-52

0

384.6

PL-072-224

2022-07-15

2022-07-21

472,847

5,829,384

326.0

349

-61

0

386.2

PL-073-223

2022-07-16

2022-07-23

472,816

5,829,589

360.0

146

-52

0

392

PL-074-225

2022-07-28

2022-08-02

472,584

5,829,497

354.0

162

-47

0

403.5

PL-075-225

2022-08-01

2022-08-06

472,571

5,829,490

354.0

177

-47

0

408

PL-076-225

2022-07-25

2022-08-05

472,846

5,829,384

326.0

314

-63

0

438

PL-077-226

2022-08-08

2022-08-24

472,864

5,829,390

326.0

354

-56

0

433.38

PL-078-226

2022-08-25

2022-09-01

472,939

5,829,369

326.0

341

-55

0

339.7

PL-079-225

2022-08-06

2022-08-15

472,538

5,829,480

357.0

177

-48

0

417

PL-080-226

2022-08-16

2022-08-23

472,687

5,829,511

354.0

193

-55

0

418.5

PL-081-226

2022-08-24

2022-08-30

472,689

5,829,499

354.0

177

-46

0

367.7

PL-082-226

2022-08-30

2022-09-02

472,718

5,829,455

355.0

6

-61

0

241.5

PL-083-226

2022-09-02

2022-09-06

472,971

5,829,367

326.0

343

-57

0

377.3

PL-084-226

2022-09-07

2022-09-11

472,983

5,829,380

325.0

358

-42

0

327

PL-085-227

2022-09-02

2022-09-05

472,731

5,829,472

354.0

309

-57

0

232

PL-086-227

2022-09-05

2022-09-08

472,731

5,829,472

354.0

162

-46

0

201

PL-087-227

2022-09-08

2022-09-11

472,701

5,829,451

354.0

318

-50

0

213.4

PL-088-227

2022-09-11

2022-09-16

472,706

5,829,453

354.0

173

-46

0

210.7

PL-089-227

2022-09-16

2022-09-17

472,762

5,829,514

360.0

360

-50

0

87

PL-090-227

2022-09-11

2022-09-15

472,746

5,829,371

326.0

334

-45

0

289.4

PL-091-227

2022-09-15

2022-09-18

472,663

5,829,362

327.0

338

-43

0

261.4

PL-092-22

2022-09-17

2022-10-20

472,762

5,829,514

360.0

174

-46

0

274.5

PL-093-22

2022-09-20

2022-09-23

472,614

5,829,329

328.0

345

-47

0

253.6

PL-094-22

2022-09-24

2022-10-01

472,657

5,829,357

326.0

351

-54

0

339

PL-095-22

2022-09-20

2022-09-23

472,785

5,829,531

362.0

165

-44

0

258.6

PL-096-22

2022-09-23

2022-09-30

472,865

5,829,583

359.0

136

-44

0

425.3

PL-097-22

2022-10-03

2022-10-04

472,698

5,829,535

354.0

6

-70

0

12.5

PL-098-22

2022-10-01

2022-10-09

472,756

5,829,387

327.0

317

-58

1

471

PL-099-22

2022-10-09

2022-10-15

472,529

5,829,361

330.0

345

-65

0

477

PL-GDH-11-22

2022-07-22

2022-07-24

473,046

5,829,379

325.0

285

-47

0

173.5

PL-GDH-12-22

2022-07-23

2022-07-25

472,456

5,829,470

358.0

119

-45

0

228


Total metres drilled 

14,641.1

Notes:

1: Reported on Release July 25, 2022


2: Reported on Release August 17, 2022


3: Reported on Release September 20, 2022


4: Reported on Release October 11, 2022


5: Reported on Release November 16, 2022








6: Reported on Release December 14, 2022


7: Reported on Release January 10, 2023

Due Diligence

All scientific and technical information in this release has been reviewed and approved by Garth Drever, P.Geo., the qualified person (QP) under the definitions established by National Instrument 43-101.  Under Frontier's QA/QC procedures, all drilling was completed by Chenier Drilling Ltd. of Val Caron, ON using thin walled BTW drill rods (4.2 cm core diameter) and a Reflex ACT III oriented core system. Using the Reflex system, the drill core was oriented and marked as it was retrieved at the drill. The core was boxed and delivered to the Frontier core shack where it was examined, geologically logged, and marked for sampling. The core was photographed prior to sampling.  Using a rock saw, the marked sample intervals were halved with one-half bagged for analysis. Sample blanks along with lithium, rubidium and cesium certified reference material was routinely inserted into the sample stream in accordance with industry recommended practices. Field duplicate samples were also taken in accordance with industry recommended practices. The samples were placed in poly sample bags and transported to Red Lake by float plane and then shipped to AGAT Laboratories Ltd. (AGAT) in Thunder Bay for sample preparation and to Mississauga, Ontario for processing and quantitative multi-element analysis. AGAT is an ISO accredited laboratory. The core is stored on site at the Pakeagama Lake exploration camp.

Other Matters

The Company would also like to announce at this time that is has granted 500,000 stock options under the New Stock Option Plan (the "Options"). The Options have been issued to certain directors, officers, or employees of the Company. The Options are exercisable at a price of $ $2.73 per common share and will have a term of 5 years from the date of issuance. 50% of these Options vest on the grant date, and the remaining 50% vest on the date that is the first anniversary date of the grant date. These Options are subject to approval by the TSXV.

About Frontier Lithium

Frontier Lithium is a preproduction business with an objective to become a strategic domestic supplier of spodumene concentrates for industrial users as well as battery-grade lithium hydroxide and other chemicals to the growing electric vehicle and energy storage markets in North America. The Company maintains the largest land position and resource in a premium lithium mineral district located in Ontario's Great Lakes region.

About PAK Lithium Project

The PAK lithium project contains one of North America's highest-grade lithium resources. The project encompasses close to 27,000 hectares and remains largely unexplored; however, since 2013, the company has delineated two premium spodumene-bearing lithium deposits (PAK and Spark), located 2.3 kilometres apart. Exploration is continuing on the project through two other spodumene-bearing discoveries: the Bolt pegmatite (located between the PAK and Spark deposits), as well as the Pennock pegmatite (25 kilometres northwest of PAK deposit within the project claims). A 2021 preliminary economic assessment (National Instrument 43-101 technical report titled "NI 43-101 Technical Report, Pak Property, PAK, Red Lake Mining District, Ontario, Canada" by BBA E&C Inc., with an effective date of April 5, 2021) delivered a fully integrated lithium operation, including the mine and mill and the conversion plant for production of battery-quality lithium salts.

Forward-looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and those actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, Investors should review the Company's registered filings available at sedar.com.

SOURCE Frontier Lithium Inc.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2023/08/c6919.html